November 26, 2026 at 6:15 am

Train Conductor Was Ordered To Follow A Written Procedure That Didn’t Work, So He Complied With The New Yard Manager’s Instructions And Left The Train Far Behind Schedule

by Chris Allen

Train conductor

Shutterstock

Sometimes the rulebook forgets how real machines actually work.

One railroad manager trusted written instructions more than experienced workers.

The crew followed every word.

Their train went nowhere.

Let’s see how long this gentle disaster lasted.

In Order To Couple Trains, The Book Says To Make Them Kiss

My grandpa used to work for the railroad as a Signalman.

This sounds like an important job.

His role was to ride on the back of the train and use a lantern to communicate through signals to the train driver at the front. At that time, trains were much shorter than they are today.

In modern times, safety regulations are written in blood and have good reasons behind them. My grandpa said that back in those days, safety protocols were still being developed, and those working on the trains had a better understanding of what was truly safe and effective, as opposed to what the rulebook suggested.

Here is a helpful explanation of what couplings are.

A bit more information: the mechanism that connects trains is called a ‘coupling,’ and the two parts come together, lock, and they’re solidly connected. Now, to compare the situation to LEGOs, you don’t just delicately set one LEGO on top of another and expect them to connect.

You have to put these bits of plastic together firmly enough to get that Snap! noise. Train couplings are similar, only we’re talking about metal carriages that are weighed in tons, not tiny plastic bits measured in grams. So instead of a Snap!, you need a good, proper Bang!

Onward to the actual story!

New people are often very by the book.

The train depot had recently hired a new manager (I’m not sure if they have an official title, so I’ll just refer to him as a manager), who decided to be very By The Book.

He very quickly became hated by everyone, because the rulebook of the time was written by someone more concerned with creating arbitrary rules rather than ensuring that things would actually work.

Oh boy, what does he want now.

Grandpa grabbed his lanterns and jumped into the caboose at the end of a line of trains. The engine backed up along the track to prepare for coupling, and the manager came running out, yelling and waving his arms.

The engine driver and the manager argued back and forth, and even Grandpa could see the engine driver’s exasperated sigh from the back of a train. Malicious compliance was initiated!

I think the drier knows what he is doing.

The engine slowly backed along the track until the couplings came together in a gentle kiss (or as gentle as two multi-ton titans can kiss). The chain of trains didn’t even shudder. The engine driver then moved forward, leaving the line of trains behind.

The couplings touched, but there was no Bang! to signal their connection. Grandpa signaled that it didn’t work.

He is clearly doing this on purpose.

The train stopped, then slowly and gently reversed again. Another kiss, but no coupling. Pulled forward, backed up, tried again. Kiss. No coupling. This repeated for fifteen minutes before the engine driver and the manager got into another argument.

Grandpa said he could guess the argument:

I can just imagine the frustration of the driver.

Engine Driver: “This isn’t working, and we’re wasting time! We need to get back on schedule!”

Manager: “Nope! Keep following the book exactly! No deviation. The book says this will work, so follow the book until it does!”

Come on new guy, give it up.

Fifteen more minutes passed of Kiss. No coupling. Pull forward, back up, try again. They had been at it for 30 minutes by now, and the train was officially behind schedule. However, the manager was still insisting that they MUST keep doing it by the book.

Finally, someone higher up (the Depot/Station Master?) came along, trying to find out why the engine was acting like the slowest pendulum in existence and why they had wasted half an hour.

Finally, someone put the new manager in his place.

After getting the story from both the Engine Driver and Manager, Depot Master finally told the manager to shut his howling screamer and let the people who actually work on trains get the job done. This stupid process had gone on long enough, and it was painfully obvious that the book was wrong.

The manager crossed his arms and was steaming.

Imagine that, it worked like a charm.

The engine pulled forward a bit more than by the book. The whistle blew its warning call, and then came in reverse at a good clip. Obviously not at full ramming speed, but fast enough to get the job done.

Bang!

And finally, the train can get moving.

The line of trains shuddered gently, then the engine pulled forward. The trains were FINALLY coupled. Grandpa signaled “All good,” and the train got underway.

Grandpa didn’t get to hear the reaming, but the manager looked like a little boy getting the scolding of his life as the caboose passed him on its way out of the depot.

It is one thing to do things by the book the first few times, but once you realize it doesn’t work, maybe trust the experts.

Read on to see what the people in the comments have to say about it.

Sometimes the best managers are those who do the least.

Comment 5 14 Train Conductor Was Ordered To Follow A Written Procedure That Didn’t Work, So He Complied With The New Yard Manager’s Instructions And Left The Train Far Behind Schedule

Absolutely, he’s lucky he kept his job.

Comment 4 16 Train Conductor Was Ordered To Follow A Written Procedure That Didn’t Work, So He Complied With The New Yard Manager’s Instructions And Left The Train Far Behind Schedule

Ouch, that would be awful.

Comment 3 25 Train Conductor Was Ordered To Follow A Written Procedure That Didn’t Work, So He Complied With The New Yard Manager’s Instructions And Left The Train Far Behind Schedule

Here is input from a train conductor.

Comment 2 25 Train Conductor Was Ordered To Follow A Written Procedure That Didn’t Work, So He Complied With The New Yard Manager’s Instructions And Left The Train Far Behind Schedule

If you enjoyed this story, check out this post about a car owner who gets annoyed with his mechanic for taking too long, so pays to have the car towed home.

I bet this was fun to watch.

Comment 1 25 Train Conductor Was Ordered To Follow A Written Procedure That Didn’t Work, So He Complied With The New Yard Manager’s Instructions And Left The Train Far Behind Schedule

The manager forced the crew to gently touch the couplings repeatedly, wasting thirty minutes without connecting anything.

A higher-up finally let the experienced driver use proper force, producing one successful bang.

Enjoyed this story?

Readers who liked this also read this story about an employee who quits and finds a better job after their employer suggests they switch to contractor status if they want more money.
Read Story→